Everything Mary
Collapsible Rolling Serger Machine Case, Black Floral
Collapsible Rolling Serger Machine Case, Black Floral
Couldn't load pickup availability
Share
Interior Dimensions: 13.5" L x 14" W x 10" H
The Collapsible Serger Machine Rolling Storage Case is the perfect option for traveling with your serger machine. This serger machine case is constructed from beautiful high-quality polyester material. This material is smudge proof and is super easy to clean. The interior dimensions of this tote are 13.5" L x 14" W x 10" H meaning our machine tote holds any serger machine that fit within these dimensions! This carrying case for sergers and overlock machines keeps your valuable Brother Singer Bernina Babylock Viking or any other serger machine protected. Along with storing your serger machine, this case packs a mighty punch for storing notions accessories and more 4 total storage spaces are crafted in this bag including a large front pocket two side pockets and a large clear pocket under the lid. Our serger case travels easily with 2 wheels and extendable handle. This case is also all the way collapsible and packs away easily. Our cases come in several elegant - premium colors The Everything Mary Collapsible Serger Machine Rolling Storage Case is sure to keep your small or large machines safe for many years to come!
