1
/
of
11
Everything Mary
XL 4 Wheel Collapsible Deluxe Rolling Sewing Machine Storage Case, Black Quilted
XL 4 Wheel Collapsible Deluxe Rolling Sewing Machine Storage Case, Black Quilted
Regular price
$166.00 CAD
Regular price
Sale price
$166.00 CAD
Taxes included.
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Share
Travel smart and store with confidence using the Everything Mary XL Rolling Sewing Machine Case in Black Quilted. Designed for everyday makers who want protection without bulk, this wheeled case keeps your sewing machine secure and your supplies organized—whether you’re heading to class, a retreat, or simply storing your machine at home.
- Roomy main compartment – Sized to comfortably fit most standard sewing machines with extra space for fabric, foot pedals, cords, and tools.
- Structured, durable construction – Reinforced shaping and quilted polyester help protect your machine while maintaining a clean, classic look.
- Smooth 4-wheel mobility – Four 360° spinner wheels and reinforced handles make navigating classrooms, hallways, and workshops effortless.
- Organized interior storage – Multiple pockets and compartments keep accessories visible, secure, and easy to access.
- Collapsible for easy storage – Folds down neatly when not in use, saving space without sacrificing structure.
Fit & Dimensions
- Interior (W x D x H): 19.50" x 10.50" x 14.00"
- Exterior (W x D x H): 22.00" x 13.50" x 17.75"
Compatibility Note: Sewing machine sizes vary by brand and model. Always measure your machine and compare it to the interior dimensions listed above to ensure the best fit.
