1
/
of
10
Everything Mary
Everything Mary XXL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Black & Floral Trim
Everything Mary XXL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Black & Floral Trim
Regular price
$222.00 CAD
Regular price
Sale price
$222.00 CAD
Taxes included.
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Share
Travel beautifully with the Everything Mary XXL Rolling Sewing Machine Case in Black with Floral Trim. Designed for serious makers, this extra-large roller protects your sewing or embroidery machine while keeping tools, fabric, and accessories neatly organized—so getting to class, a retreat, or your next project feels effortless and polished.
- Extra-large main compartment – Sized to accommodate larger sewing and embroidery machines with room to spare for fabric, patterns, and supplies.
- Durable, reinforced construction – Crafted from smudge-resistant polyester to help protect your machine and stand up to frequent travel and everyday use.
- Smooth 4-wheel mobility – Four 360° spinner wheels and reinforced handles provide stable, easy movement through classrooms, hallways, and event spaces.
- Smart, visible organization – Multiple exterior pockets and interior straps keep tools, notions, and accessories secure and easy to find.
- Designed for busy creators – Reliable zippers and a thoughtful layout help keep everything protected and in place while you’re on the go.
Fit & Dimensions
- Interior (W x D x H): 21.50" x 13.00" x 15.00"
- Exterior (W x D x H): 26.00" x 16.00" x 19.00"
Compatibility Note: Machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements listed above to ensure the best fit.
