Skip to product information
1 of 10

Everything Mary

Everything Mary XXL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Black Floral

Everything Mary XXL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Black Floral

Regular price $222.00 CAD
Regular price Sale price $222.00 CAD
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity

Travel beautifully with the Everything Mary XXL Rolling Sewing Machine Case in Black Floral. Designed for sewists who need maximum space and dependable protection, this wheeled craft tote comfortably fits larger sewing and embroidery machines while keeping accessories organized and secure—so heading to class, retreats, or workshops feels effortless and polished.

  • Extra-spacious main compartment – Sized to hold large sewing machines with room to spare for fabric, thread, patterns, and tools.
  • Durable, reinforced construction – Crafted from smudge-resistant polyester with padded walls to help protect your machine during storage and travel.
  • Smooth 4-wheel mobility – Four 360° spinner wheels and reinforced handles allow for stable, comfortable rolling through tight spaces.
  • Organized storage that works – Multiple exterior pockets and interior straps keep accessories secure, visible, and easy to reach.
  • Built for busy makers – Reliable zippers and thoughtful construction keep everything steady while you’re on the move.

Fit & Dimensions

  • Interior (W x D x H): 22.00" x 12.50" x 16.00"
  • Exterior (W x D x H): 26.50" x 15.50" x 19.75"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements listed above to ensure the best fit.

View full details