Skip to product information
1 of 9

Everything Mary

Everything Mary XL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Tan & Grey Floral

Everything Mary XL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Tan & Grey Floral

Regular price $166.00 CAD
Regular price Sale price $166.00 CAD
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity

Travel beautifully with the Everything Mary XL Rolling Sewing Machine Case in Grey Floral. Designed for makers who craft at home and on the go, this wheeled case offers reliable protection for standard sewing and embroidery machines while keeping tools, fabric, and accessories neatly organized—so every project feels easier, calmer, and more enjoyable.

  • Spacious main compartment – Designed to hold standard sewing machines with room to spare for fabric, patterns, thread, and essential tools.
  • Premium, durable construction – Reinforced polyester with padded lining, strong zippers, and double stitching helps protect your machine and stand up to frequent use.
  • Smooth 4-wheel mobility – Four 360° spinner wheels provide effortless movement through classrooms, workshops, and craft retreats.
  • Organized storage that makes sense – Multiple interior and exterior pockets keep accessories visible, secure, and easy to access.
  • Space-saving, collapsible design – Structured when in use and collapsible for convenient storage when space is tight.

Fit & Dimensions

  • Interior (W x D x H): 19.50" x 10.50" x 14.00"
  • Exterior (W x D x H): 22.00" x 13.50" x 17.75"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements listed above to ensure the best fit.

There is additional shipping with these.

View full details