Skip to product information
1 of 12

Everything Mary

Everything Mary XL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Artistic Floral

Everything Mary XL 4 Wheel Collapsible Rolling Sewing Machine Storage Case, Artistic Floral

Regular price $166.00 CAD
Regular price Sale price $166.00 CAD
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity

Express your creativity from home to workshop with the Everything Mary XL Rolling Sewing Machine Case in Artistic Floral. Designed for makers who move between projects and spaces, this rolling tote keeps your machine protected and your supplies organized wherever creativity takes you.

  • Craft-ready storage – A secure main compartment paired with multiple pockets keeps tools, notions, and accessories organized and easy to find.
  • Effortless mobility – Four smooth-rolling 360° wheels provide stable, easy movement through tight spaces and across varied surfaces.
  • Durable, everyday construction – High-quality, smudge-resistant polyester is built to withstand frequent use while protecting your gear.
  • Compact and efficient – Designed to hold your machine and supplies in one streamlined tote, reducing clutter and setup time.
  • Easy storage between projects – Collapsible design allows the case to store neatly when not in use.

Fit & Dimensions

  • Interior (W x D x H): 19.50" x 10.50" x 14.00"
  • Exterior (W x D x H): 22.00" x 13.50" x 17.75"

Compatibility Note: Sewing machine sizes vary by brand and model. Always compare your machine’s dimensions to the interior measurements listed above to ensure the best fit.

View full details