Skip to product information
1 of 13

Everything Mary

Everything Mary Jumbo 5 Wheel Collapsible Rolling Sewing Machine Storage Case, Black

Everything Mary Jumbo 5 Wheel Collapsible Rolling Sewing Machine Storage Case, Black

Regular price $312.00 CAD
Regular price Sale price $312.00 CAD
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity

The Everything Mary Floral Jumbo Rolling Tote combines elegance and practicality for individuals who need both style and function in their storage solution. The beautiful floral design makes it stand out, while the spacious interior is perfect for organizing everything from fabric and craft supplies to travel necessities and professional tools. Designed for durability and ease of transport, this tote comes with smooth-rolling wheels and a sturdy retractable handle. Whether you're heading to a quilting class, a crafting retreat, or a weekend getaway, the Everything Mary Floral Jumbo Rolling Tote ensures you can carry everything you need, with no heavy lifting required. With its charming floral design and versatile storage capabilities, this tote is a must-have for anyone who values both style and convenience. It’s the perfect choice for staying organized and looking great while on the go.

Interior Dimensions: 28L x 14D x 14.5H

Exerior Dimensions: 31.L x 14.25D x 19 H 

View full details